Romilly's HART® and Fieldbus Message Board
    
[ Follow Ups ] [ Post Followup ] [ Back to top of Message Board ]
dll testing on htest & analys
Message posted by abhishek patel (akpatel.16@gmail.com : 59.95.84.111) on 04 June 2010 at 07:29:47.
Dear sir,
                I passed  36 DLL tests on HTEST & ANALYS set up but 8 DLL test failed. i am not understanding where is problems.details of failure reports as follows :
 
1) for test DLL 034 : 
      Failure message:   insufficient STX's detected.failure point == 354     
 
2) for test DLL 032 : 
      Failure message:   test spec requires at least 64 STX commands.failure point == 348 
 
3) for test DLL 033c : 
      Failure message:   test spec requires at least 4 STX's commands.failure point == 352 
 
4) for test DLL 029 : 
      Failure message:   response time is < RT1.failure point == 846,847,848.
 
5) for test DLL 028 : 
      Failure message:   291 messages captured are insufficient .failure point == 396
 
6) for test DLL 027 : 
      Failure message:   BACK RESPONSE TIME <  RT2.failure point == 839
 
7) for test DLL 026 : 
      Failure message:   cmd2 always answers busy.failure point == 431
                                        500 messages  captured are insufficient.failure point == 395
 
8) for test DLL 024b : 
      Failure message:   249 messages  captured are insufficient.failure point == 426 
  
                                        please guide me to solve above problems.(problem in s/w, test setup, system configuration & state machine timing).
Thanking you.
                                                                                                        Regards
                                                                                                       Abhishek Patel
                                                                                                       Devlopment engineer
[ Follow Ups ] [ Post Followup ] [ Back to top of Message Board ]